Main Projects
Draft project of U.B.S study for soybean - Morrinhos/Uberlândia 14 tons/h.
Draft project, specifications and estimate of investment and construction management of UBS
for soy RR-Rio Grande do Sul-14 tons/hour.
Draft project, estimate and assistance to build towers for corn plants following grading:
Itai, Uberlândia and Santa Helena.
-
Main Projects
Draft project and feasibility study for the construction of a port terminal for liquid bulk.
Draft project, specifications and technical advice for the construction of a terminal in alcohol,
capacity of 35.000 m/cubic.
-
Main Projects
Survey, draft and evaluation of costs for modernization of transhipment of dry bulk terminal
with capacity of 420.000 tons. Ponta Grossa/PR.
Draft project, specifications, investment estimate and technical advice for the transformation of terminal
Ponta Grossa in retro-port to meet the Port of Paranaguá - capacity of 420.000 tons.
-
Main Projects
Advice and technical support for the import, installation and operation of high precision classifiers for
Corn seed - 120 tons/day - Ituiutaba/MG.
UBS p/high-tech corn seed - 2.5 tons/hour for plants of Matão and Ituiutaba.
-
Main Projects
Survey, study, design and advice for hiring of lots and construction management of a terminal
Port in export corridor from the Port of Paranaguá. Capacity of 107.000 tons and 3.000 tons/hour
boarding.
-
Main Projects
Project, specifications, advice and management to build a UBS for corn - 180.000 bags/s.
-
Main Projects
Draft project, specifications and cost estimate for a port terminal 70.000 tons static and 1.500 tons/hour. Port of Paranaguá/PR.
flow.
-
Main Projects
Project and management of the Renovation of the export corridor of the Port of Paranaguá,
including the reform of a ship loader, installation of new transport equipment, purchase of a new ship loader and automation.
-
Main Projects
U.B.S. for corn 2.5 tons/hour.
-
Main Projects
Project, specifications and estimate of investment for UBS corn 2.5 tons/hour.